Skip to main content
Skip table of contents

C.7 Project management

his section consists of a list of questions with input fields to be completed in the input languages set by the programme.

Two sections are table sections:

In section C7.5, the applicant should tick the criteria and fill in a description related to the criteria it contributes to.

Section C7.6 contains predefined horizontal principles, also the type of contribution is a predefined toggle button. The description is a free text input.

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.