Release notes V 10.0.0
Completed features
Project closure report and its inclusion in the Reporting schedule
Integrated external developments
Critical bug fix concerning PR verification
The features delivered in Jems v 9.0.0 Reopening of Project reports and Reopening of MA/JS verification contained a critical bug: Costs from additional certificates added to a Project report that was reopened after Verification work had been started were not taken over in the Verification work section. This means that the cost items from those additional certificates were not added to the Expenditure verification table and additional costs were not calculated in the amount “Total eligible after Verification” or “Current report after verification”.
This bug was directly fixed with v 10.0.0 and no separate hotifx of v 9.0.0 was provided. Therefore, this bug still persists for users of v 9.0.0.
Technical aspects
Jems was updated to run on Java 17 (see migration notes)
SpringBoot was updated to 2.7.7
Cloud-flight gradle plugin was updated to 7.4.0
Jems plugin-contract version: 1.6.7
Plugin
SFC transmission of data table 2 (Programme export, developed by Alpine Space Programme)