Completed features
-
Contracting
-
Partner-level reporting (financial and content)
-
Fast track lump sum payments
-
Advance payments creation
-
Draft budget (project proposed unit costs)
-
Controllers
-
Institutions - Creation of institutions and respective user management
-
Assignment - Assignment of control institutions to project partners
-
-
Filter for project assignment tab
-
Programme setup: Codes of intervention can be assigned to Specific objectives; Fast track lump sums can be defined; Typology of errors can be defined
-
Project results: period “After project implementation” introduced
UX
-
Accessibility standard has been updated to refer to the latest standard “EN 301 549 V3.2.1 (2021-03)”
-
Application form overview: Funding decision date added
-
AF translation files support new lines '\n', see Initial translation management
Technical improvements
-
Startup parameters, see Installation instructions | Jems service installation
-
Jems logging into file parameters
-
Enable captcha
-
-
Project data export: support of multiple plugins
-
Programme setup: Deletion of items allowed in every subsection (until first Call is published)
-
A dummy pre-submission check plugin for step 1 is provided which always succeeds (checking for Acronym)
-
Audit log: file operations in every place are logged and more details are provided (breadcrumb)
Fixes
-
Assessment and decision panel is visible also in status Draft in a 2-step procedure
-
Application form: investment can be deleted
Security Updates
The vulnerability CVE-2022-42889 was reported https://cve.mitre.org/cgi-bin/cvename.cgi?name=CVE-2022-42889
Only jems-standard-plugin was indirectly affected as it used: opencsv version 5.5.2 which uses commons-text version 1.9 .
No negative impact was assumed, but to satisfy any potential dependency vulnerability checks the openscv version used was updated to now also indirectly use a fixed version of commons-text.
Coming soon
-
HIT Application form for SPF: Budget summary tables B, D.2 and D.3.1, budget export to xls
-
Partner level management verification
-
Project level reporting (content and finances)
-
Project proposed Lump sums (Draft budget)
-
Keep interface