General purpose
Pre-submission checks shall safeguard a basic level of completeness and consistency of a submitted application form. This provides a certain level of security to applicants and saves formal verification effort on the side of programme officers. Each Application form requires a successful pre-submission check of content before it can be submitted. Note that automatic checks do not replace human control of application contents.
A successful pre-submission check is no guarantee that an application is fully complete and formally compliant!
Pre-submission checks include verification of mandatory fields and conditions.
Pre-submission rules include business conditions and verification of mandatory fields!
Location and access
Pre-submission checks are located in the Application lifecycle section.
Execution of pre-submission checks
-
A pre-submission check needs to be executed every time the user wants to submit or re-submit an application form.
-
The results are shown in an expandable tree. A verification result can be displayed for each section of the application form.
-
If the pre-submission check is passed successfully, the submit button will be activated.
-
If the application form is changed or a section is missing, the pre-submission check needs to be executed again.
Types of pre-submission check results
There are three types of pre-submission check results:
|
Error icon |
Comment |
|---|---|
|
|
Error - verification failed. Required user interaction. |
|
|
Warning - there are recommendations on how to enhance the data quality of the Application Form User interaction is desirable. |
|
|
Info - verification passed successfully. |
All plugin feedback (errors, info.. messages) can be found in a translation file inside of the plugin jar (root directory) - This file is exactly same structure as a system translation file.
In order to translate the plugin, programme shall save the new translation file(s) in the root directory of the jar, following same filename convention (e.g. plugin_messages_fr.properties)
Add-on approach and predefined pre-submission checks
Pre-submission checks are delivered in the form of an add-on. This provides flexibility to programmes to apply individual checks.
Pre-submission rules can be defined by the programmes via an update of the pre-submission add-on.
Find additional information in the related section https://jems-eu.atlassian.net/wiki/spaces/DOC/pages/1854898202
In order to execute a pre-submission check, the user should click the button Run Pre-submission check.
The following table lists the set of predefined pre-submission checks, which are supported by HIT.
|
Section/Field/Condition |
Rule |
|---|---|
|
A.1 Project identification / Acronym |
Mandatory (for step 1 & step 2 in case of a 2-step call using the standard plugin) |
|
A.1 Project identification / Project title |
Mandatory |
|
A.1 Project identification / Project duration |
Mandatory |
|
A.1 Project identification / Programme priority |
Mandatory |
|
A.2 Project summary / Summary in English |
Mandatory if EN is not application form language |
|
|
|
|
B. Project partners |
At least one active project partner should exist |
|
B.1 Partner identity / Partner role |
exactly one active lead partner |
|
B.1 Partner identity / Abbreviated name of the organisation |
Mandatory |
|
B.1 Partner identity / Name of the organisation in original language |
Mandatory |
|
B.1 Partner identity / Name of the organisation in English |
Mandatory |
|
B.1 Partner identity / Department / unit / division |
Mandatory |
|
B.1 Partner identity / Legal status |
Mandatory |
|
B.1 Partner identity / VAT or other identifier |
Mandatory |
|
B.1 Partner identity / Is your organisation entitled to recover VAT...? |
Mandatory |
|
|
|
|
B.2 Partner main address / Country |
Mandatory |
|
B.2 Partner main address / NUTS2 |
Mandatory |
|
B.2 Partner main address / NUTS3 |
Mandatory |
|
B.2 Partner main address / Street |
Mandatory |
|
B.2 Partner main address / House no. |
Mandatory |
|
B.2 Partner main address / Postal code |
Mandatory |
|
B.2 Partner main address / City |
Mandatory |
|
|
|
|
B.3 Address of department / unit / division (if applicable) / Country |
Mandatory (if applicable) |
|
B.3 Address of department / unit / division (if applicable) / NUTS2 |
Mandatory (if applicable) |
|
B.3 Address of department / unit / division (if applicable) / NUTS3 |
Mandatory (if applicable) |
|
B.3 Address of department / unit / division (if applicable) / Street |
Mandatory (if applicable) |
|
B.3 Address of department / unit / division (if applicable) / House no. |
Mandatory (if applicable) |
|
B.3 Address of department / unit / division (if applicable) / Postal code |
Mandatory (if applicable) |
|
B.3 Address of department / unit / division (if applicable) / City |
Mandatory (if applicable) |
|
|
|
|
B.4 Legal representative / First name |
Mandatory |
|
B.4 Legal representative / Last name |
Mandatory |
|
|
|
|
B.5 Contact person / First name |
Mandatory |
|
B.5 Contact person / Last name |
Mandatory |
|
B.5 Contact person / E-mail address |
Mandatory |
|
B.5 Contact person / Telephone no. |
Mandatory |
|
|
|
|
B.6 Motivation and contribution / Which of the organisation's thematic competences and experiences are relevant for the project? |
Mandatory |
|
B.6 Motivation and contribution / What is the role (contribution and main activities) of you organisation in the project? |
Mandatory |
|
|
|
|
B. Associated organisation / Name of the organisation in original language is missing |
Mandatory |
|
B. Associated organisation / Partner is missing |
Mandatory |
|
B. Associated organisation / Country is missing |
Mandatory |
|
B. Associated organisation / NUTS2 is missing |
Mandatory |
|
B. Associated organisation / NUTS3 is missing |
Mandatory |
|
B. Associated organisation / Street is missing |
Mandatory |
|
B. Associated organisation / House no. is missing |
Mandatory |
|
B. Associated organisation / Postal code is missing |
Mandatory |
|
B. Associated organisation / City is missing |
Mandatory |
|
B. Associated organisation / Legal representative: First name is missing |
Mandatory |
|
B .Associated organisation / Legal representative: Last name is missing |
Mandatory |
|
B. Associated organisation / Contact person: First name is missing |
Mandatory |
|
B. Associated organisation / Contact person: Last name is missing |
Mandatory |
|
B. Associated organisation / Contact person: E-mail address is missing |
Mandatory |
|
B. Associated organisation / Contact person: Telephone no. is missing |
Mandatory |
|
B. Associated organisation / Role of the associated organisation is missing |
Mandatory |
|
B. Associated organisation / Contact person or Legal representative is missing |
Mandatory |
|
|
|
|
Partner Co-financing / Source is missing |
Mandatory |
|
Partner Co-financing / Percentage is missing |
Mandatory |
|
Partner Co-financing / Legal status is missing |
Mandatory |
|
Partner Co-financing / Amount > 0 |
Mandatory |
|
|
|
|
Project partner budget: Budget allocation to periods |
Mandatory (if applicable) |
|
Project partner budget: Staff costs |
Mandatory (if applicable) |
|
Project partner budget: Travel and accommodation |
Mandatory (if applicable) |
|
Project partner budget: External expertise and services |
Mandatory (if applicable) |
|
Project partner budget: Equipment |
Mandatory (if applicable) |
|
Project partner budget: Infrastructure and works |
Mandatory (if applicable) |
|
Project partner budget: Unit costs |
Mandatory (if applicable) |
|
Project partner budget: Description/Function |
Mandatory (if applicable) |
|
Project partner budget: Unit type |
Mandatory (if applicable) |
|
Project partner budget: No. of units |
Mandatory (if applicable) |
|
Project partner budget: Price per unit |
Mandatory |
|
Project partner budget: Programme unit cost |
Mandatory (if applicable) |
|
Project partner budget: Cost |
Mandatory (if applicable) |
|
Project partner budget: Quantity |
Mandatory (if applicable) |
|
Project partner budget: Unit costs descriptions |
Mandatory (if applicable) |
|
Project partner budget: Partner contribution |
Mandatory (if applicable) |
|
|
|
|
Partner State Aid: Criterium I answer 1 or justification is missing |
Mandatory |
|
Partner State Aid: Criterium I answer 2 or justification is missing |
Mandatory |
|
Partner State Aid: Criterium II answer 1 or justification is missing |
Mandatory |
|
Partner State Aid: Criterium II answer 2 or justification is missing |
Mandatory |
|
|
|
|
At least 1 project partner should exist |
Mandatory |
|
Exactly 1 Lead partner should exist |
Mandatory |
|
Project budget should be greater than 0 |
Mandatory |
|
|
|
|
C.1 Project overall objective |
Mandatory |
|
|
|
|
C.2.1 Common territorial challenge(s) |
Mandatory |
|
C.2.2 Approach to common challenges and/or opportunities |
Mandatory |
|
C.2.3 Cross-border/transnational/inter-regional cooperation needed to achieve the project’s objectives and results |
Mandatory |
|
C.2.4 Target group should have at least 1 item |
Mandatory |
|
C.2.4 Specification of target group |
Mandatory |
|
C.2.5 Strategy should have at least 1 item |
Mandatory |
|
C.2.5 Contribution to strategy |
Mandatory |
|
C.2.6 Synergy description |
Mandatory |
|
C.2.7 The project builds on available knowledge |
Mandatory |
|
|
|
|
C.3 Project partnership is missing |
Mandatory |
|
C.3 Project specific objective is missing |
Mandatory |
|
|
|
|
C.4 Project work plan / C.4 Project work plan |
Mandatory |
|
C.4 Project work plan / Work plan should have at least 1 work package |
Mandatory |
|
C.4 Project work plan / Work package titles |
Mandatory (if applicable) |
|
C.4 Project work plan / Work plan should have at least 1 output |
Mandatory |
|
C.4 Project work plan / Outputs |
Mandatory |
|
C.4 Project work plan / Work package should have at least 1 activity |
Mandatory |
|
C.4 Project work plan / Work package objectives |
Mandatory |
|
C.4 Project work plan / Work package / Specific objective |
Mandatory |
|
C.4 Project work plan / Work package / Communication and audience objective |
Mandatory |
|
C.4 Project work plan / Work package / Activities |
Mandatory |
|
C.4 Project work plan / Activity / Title |
Mandatory |
|
C.4 Project work plan / Activity / Description |
Mandatory |
|
C.4 Project work plan / Activity / Start period |
Mandatory |
|
C.4 Project work plan / Activity / End period |
Mandatory |
|
C.4 Project work plan / Activity / Deliverable |
Mandatory (if applicable) |
|
C.4 Project work plan / Activity / Activity should have at least 1 partner |
Mandatory (if applicable) |
|
C.4 Project work plan / Deliverable / Delivery period, title or description |
Mandatory (if applicable) |
|
C.4 Project work plan / Work package / Outputs |
Mandatory |
|
C.4 Project work plan / Output / Programme output indicator |
Mandatory |
|
C.4 Project work plan / Output / Output title |
Mandatory |
|
C.4 Project work plan / Output / Output description |
Mandatory |
|
C.4 Project work plan / Output / Delivery period |
Mandatory |
|
C.4 Project work plan / Output / Output description |
Mandatory |
|
C.4 Project work plan / Work package / Investments |
Mandatory |
|
C.4 Project work plan / Investment / Title |
Mandatory (if applicable) |
|
C.4 Project work plan / Investment / Delivery period |
Mandatory (if applicable) |
|
C.4 Project work plan / Investment / Justification explain |
Mandatory (if applicable) |
|
C.4 Project work plan / Investment / Cross-border/transnational relevance |
Mandatory (if applicable) |
|
C.4 Project work plan / Investment / Who is benefiting |
Mandatory (if applicable) |
|
C.4 Project work plan / Investment / Risk |
Mandatory (if applicable) |
|
C.4 Project work plan / Investment / Documentation: Technical requirements and permissions |
Mandatory (if applicable) |
|
C.4 Project work plan / Investment / Documentation: Assessment of expected impacts of climate change |
Mandatory (if applicable) |
|
C.4 Project work plan / Investment / Ownership: site owner |
Mandatory (if applicable) |
|
C.4 Project work plan / Investment / Ownership: retention |
Mandatory (if applicable) |
|
C.4 Project work plan / Investment / Ownership: maintenance |
Mandatory (if applicable) |
|
|
|
|
C.5 Results / Programme result indicator |
Mandatory |
|
C.5 Results / Delivery period |
Mandatory (if applicable) |
|
C.5 Results / Description |
Mandatory |
|
|
|
|
C.7.1 Project coordination |
Mandatory |
|
C.7.2 Quality assurance measures |
Mandatory |
|
C.7.3 Project communication approach |
Mandatory |
|
C.7.4 Financial management and reporting procedures |
Mandatory |
|
C.7.5 At least 3 Cooperation criteria should be selected, "Joint development" and "Joint implementation" are mandatory |
Mandatory |
|
C.7.5 Cooperation criteria description for selected cooperation criteria |
Mandatory |
|
C.7.6 Horizontal principles type |
Mandatory |
|
C.7.6 Horizontal principles description |
Mandatory |
|
C.8.1 Ownership |
Mandatory |
|
C.8.2 Durability |
Mandatory |
|
C.8.3 Transferability |
Mandatory |
|
|
|
|
E. Project lump sums / Lump sum Partner shares are missing |
Mandatory (if applicable) |
|
E. Project lump sums / Lump sum allocation to periods is missing |
Mandatory (if applicable) |
For applications for Small project funds type, the plugin adapts in following points:
-
B. Project partners: “Exactly 1 SPF beneficiary must be active”
-
B. Partner identity: “Type of partner [partnername] is missing
-
B. Partner budget: “Management budget should be greater than 0”
-
B. Partner budget: “SPF budget should be greater than 0”
-
B. Partner budget: “Share of managment budget must not exceed 20% of total budget”
-
B. Partner budget: “Small project funds allocation to periods is missing”
-
B. Partner budget SPF: “Unit type is missing”
-
B. Partner budget SPF: “No. of units is missing”
-
B. Partner budget SPF: “Description/Function is missing”
-
B. Partner budget SPF: “Price per unit is missing”
-
B. Partner: Checks of co-financing are performed for Management costs: co-financing and Small project funds co-financing tabs accordingly
-
C.2.4a “Recipient group should have at least 1 item”
-
C.2.4a “Specification of recipient group is missing”