Release notes V6


Completed features

  • Contracting

  • Partner-level reporting (financial and content)

  • Fast track lump sum payments

  • Advance payments creation

  • Draft budget (project proposed unit costs)

  • Controllers

    • Institutions - Creation of institutions and respective user management

    • Assignment - Assignment of control institutions to project partners

  • Filter for project assignment tab

  • Programme setup: Codes of intervention can be assigned to Specific objectives; Fast track lump sums can be defined; Typology of errors can be defined

  • Project results: period “After project implementation” introduced

UX

  • Accessibility standard has been updated to refer to the latest standard “EN 301 549 V3.2.1 (2021-03)”

  • Application form overview: Funding decision date added

  • AF translation files support new lines '\n', see Initial translation management

Technical improvements

  • Startup parameters, see Installation instructions | Jems service installation

    • Jems logging into file parameters

    • Enable captcha

  • Project data export: support of multiple plugins

  • Programme setup: Deletion of items allowed in every subsection (until first Call is published)

  • A dummy pre-submission check plugin for step 1 is provided which always succeeds (checking for Acronym)

  • Audit log: file operations in every place are logged and more details are provided (breadcrumb)

Fixes

  • Assessment and decision panel is visible also in status Draft in a 2-step procedure

  • Application form: investment can be deleted

Security Updates

The vulnerability CVE-2022-42889 was reported https://cve.mitre.org/cgi-bin/cvename.cgi?name=CVE-2022-42889
Only jems-standard-plugin was indirectly affected as it used: opencsv version 5.5.2 which uses commons-text version 1.9 .
No negative impact was assumed, but to satisfy any potential dependency vulnerability checks the openscv version used was updated to now also indirectly use a fixed version of commons-text.

Coming soon

  • HIT Application form for SPF: Budget summary tables B, D.2 and D.3.1, budget export to xls

  • Partner level management verification

  • Project level reporting (content and finances)

  • Project proposed Lump sums (Draft budget)

  • Keep interface